ITA   DEU   ENG   
testata

New Cortech pumping station in Jochgrimm - Passo Oclini (BZ)

This fall Cortech concluded an important project: a new pumping station in Jochgrimm - Passo Oclini (BZ).

The pumping station is equipped with 2 pumps of 100 kW, they grant a reliable and performing snowing system for all the area.

Along the ski slopes are been placed the cast iron pipe lines, for a total lenght of 600 meters. The snow is guaranteed, along the 7 km of the ski slopes, by the Cortech snow guns.

Despite the lack of natural snow during this start of the winter season, Jochgrimm - Passo Oclini can guest the skiers with the ski slopes perfectly covered by snow!